We co-develop, own and operate grid-connected energy storage and
micro-grid projects in the following western Texas areas.
Projects under development
-
Jaguar SolarMcLennan County, TX
Jaguar Solar is a 300 MWac utility-scale photovoltaic
system which began construction in 2025 and is expected to
be operational in 2028. Located outside Waco, TX, the
project is co-located with Jaguar BESS. Jaguar Solar
provides renewable energy generation while ERCOT load
growth accelerates. This initiative integrates
cutting-edge technology and sustainable energy solutions,
contributing to a greener, more reliable grid.
300 MWac
-
Axtell BESSMcLennan County, TX
Axtell BESS is a 300 MW/680 MWh battery energy storage
system located in the city of Waco, TX. The project is in
the early stages of development and is expected to be
commercially operational in 2029.
300 MW
680 MWh
-
Brooks FalfurBrooks County, TX
Brooks Falfur is a 9.9 MW/19.8 MWh battery energy storage
system located near Falfurrias, TX. The project is
construction-ready.
9.9 MW
19.8 MWh
-
Bexar BeckBexar County, TX
Bexar Beck is a 9.9 MW / 19.8 MWh battery energy storage
system located near San Antonio, TX. The project is
construction-ready.
9.9 MW
19.8 MWh